Tue, 21 Jul 2026
Headlines:
Higher allocation sought to rebuild damaged Ranau bridge
Published on: Tuesday, July 21, 2026
Published on: Tue, Jul 21, 2026
By: Ricardo Unto
Text Size:
Text:
Higher allocation sought to rebuild damaged Ranau bridge
Kota Kinabalu: Sabah Public Works Department (PWD) is preparing a justification to seek approval for a higher cost ceiling to rebuild the damaged Sungai Molout Bridge in Ranau after the initial allocation was found to be insufficient.

Assistant Rural Development Minister Datuk Samad Jambri (pic) said the bridge at Kampung Bayag (KM1.600) along Gaur Bayag Kitaie Road suffered severe damage to its abutment following erosion caused by heavy rain on Sept 7, 2025.

Advertisement
He said the State Finance Ministry had approved RM4.93 million based on the original estimate by the Ranau District Office, but the allocation was insufficient for the reconstruction of the 60-metre bridge, including a two-way carriageway and riverbank protection works.

The project cost is estimated at RM19 million, he said during question time at the State Legislative Assembly on Tuesday in reply to Paginatan assemblyman Datuk Rusdin Riman.

SPONSORED CONTENT
The 2026 D-MAX also introduces an 8-speed automatic gearbox with sequential shift across the range, including the Single Cab variant, making it the first pick-up truck in Malaysia to offer an automatic transmission in that body style.
Samad said JKR Sabah is preparing the necessary justification for submission to the State Finance Ministry to obtain approval for a revised cost ceiling, and suggested the assemblyman liaise directly with PWD for further information.
* Follow us on our official WhatsApp channel and Telegram for breaking news alerts and key updates!

* Do you have access to the Daily Express e-paper and online exclusive news? Check out subscription plans available.
Advertisement
Share this story
Advertisement
Advertisement
Advertisement
Follow Us  
           
Daily Express News  
© Copyright 2026 Sabah Publishing House Sdn. Bhd. (Co. No. 35782-P)
close
Try 1 month for RM 18.00
Already a subscriber? Login here
Try 1 month for RM 18.00
open
Try 1 month for RM 18.00
Already a subscriber? Login here